          
|
|

Report
|
Demographics
|
Get PDF
|
Click for Property Photos
| General Information |
|
Site Descriptive Name
|
10 acre industrial site
|
|
Site ID
|
165
|
|
City
|
Scribner
|
|
Site Address
|
Highway 275; Railroad Street
|
|
Site Industrial Park
|
Yes
|
|
Local Contact
|
Deb Eggelston
Economic Development Coordinator
Scribner Improvement & Industrial Corp
PO Box K
Scribner, NE
68057
Ph: (402) 664-2565
Ph: (402) 720-3719
Fax: (402) 664-2749
www.scribnernebraska.com
|
|
Site Contact
|
Deb Eggleston
Economic Development Coordinator
Scribner Improvement and Industrial Corporation
P.O. Box K
Scribner, NE
68057
Ph: 402-664-2565
Ph: 402-720-3719
Fax: 402-664-2749
www.scribnernebraska.com
|
| |
| Site Description |
|
Acreage
|
10 acres
|
|
Soil Type
|
Lutton silty soil
|
|
PSI
|
10
|
|
Topography
|
Level
|
|
Elevation
|
1,255 feet
|
|
Water Table
|
1 to 3 feet
|
|
100-Year Floodplain
|
No
|
|
Wetland
|
0
|
|
Comments
|
The site is protected from the 1-500 year flood plain
|
|
Zoned
|
Yes
|
|
Zone Class
|
Commercial and Light Industrial
|
|
Foreign Trade Zone
|
No
|
|
Specialized Local Zone
|
No
|
|
Previous Use
|
Farmland
|
| |
| Emergency Services |
|
Fire Class
|
5
|
|
Fire Station Distance
|
0.25 mile
|
|
Fire Dept Type
|
Volunteer
|
|
24-Hour Police
|
Yes
|
|
Police Station Distance
|
1
|
|
Protective Comments
|
Scribner, Nebraska has a low crime rate.
|
| |
| Electric |
|
Electric Provider
|
City of Scribner
|
|
Service Voltage
|
34,000 volt line
|
|
Distribution Voltage
|
2400/4161 Y
|
2400/4160Y three-phase distribution voltage
|
| |
| Gas |
|
Gas Provider
|
City of Scribner
|
|
Main Size
|
2
|
|
Gas Pressure
|
8 lbs
|
| |
| Water |
|
Water Provider
|
City of Scribner
|
|
Main Size
|
6"
|
|
Static
|
46-48
|
|
Residual
|
41-43
|
|
Flow Per Minute
|
430
|
|
Booster Pump
|
No
|
|
Onsite Storage
|
Yes
|
|
Elevated Storage
|
Yes
|
|
Water Storage Capacity
|
300,000
|
Water treatment with a rated capacity if 619,200 gallons per day and a peak demand of 633,900 gallons
|
| |
| Sewer |
|
Sewer Provider
|
City of Scribner
|
|
Main Size
|
8"
|
|
Distance From
|
on site
|
|
Treatment Type
|
trickling filter treatment plant
|
|
MGD
|
0.15
|
|
Peak Demand
|
0.30
|
|
Storm System
|
No
|
| |
| Communications |
|
Local Carrier
|
Great Plains Communications
|
|
Central Office
|
Blair, NE
|
|
Distance
|
34 miles
|
|
DSL
|
Yes
|
|
COFiber
|
Yes
|
|
Dual Service
|
Yes
|
Scribner's access to advanced telecommunications is comparable to that of a metropolitan area.
|
| |
| Highway Transportation |
|
Nearest Highway
|
Highway 275
|
|
Number of Lanes
|
2-Lane
|
|
Hwy Access to Property
|
Yes
|
|
Nearest 4-Lane Distance
|
2.5
|
|
Interstate Distance
|
47 miles
|
|
Interstate Minutes
|
47
|
|
Bus Service Distance
|
20 miles
|
Scribner is just 2.5 miles to the nearest 4 lane HWY.
|
| |
| Rail Transportation |
|
Distance
|
20
|
|
Drive Time
|
20 minutes
|
2 Class I RR in Fremont provide rail service to all points of the compass. Piggyback and container service is available in Omaha, 57 min. from Scribner. The ramps maintain lift on and lift off TOFC/COFC capabilities and provide pick up and delivery services.
|
| |
| Air Transportation |
|
Nearest Airport
|
Scribner State Airfield
|
|
Runway Length
|
4,200'
|
|
Lighted
|
Yes
|
|
Hard Surfaced
|
Yes
|
|
Nearest Commercial Air
|
Omaha Eppley Airfield
|
|
Near Commercial Airports
|
21
|
|
Nearest Commerical Air Distance
|
58 miles
|
|
Nearest Commerical Air Drivetime
|
71 minutes
|
Fremont Municipal Airport provides a complete range of services. It averages 50 flights daily. Omaha's Eppley Airfield has access to 21 jet service carriers, 1 commuter air carrier, 7 freight carriers, approx. 92 daily departures, and 19 non-stop flights.
|
| |
| Barge Transportation |
|
Barge Facilities
|
No
|
|
Barge Miles
|
40 miles
|
|
Barge Minutes
|
40 minutes
|
Barge service is available at 19 barge terminal facilities on the Missouri River in Nebraska. The Blair River port is 40 miles east of Scribner. Port is navigable approximately 8 months per year.
|
| |
| Miscellaneous |
|
Site Owner
|
Scribner Improvement and Industrial Corporation
|
|
Price
|
$4,500-$19,500 per acre
|
|
Tax Year
|
2009
|
|
Per $100 of Actual Value
|
1.742767
|
|
County Tax
|
0.223297
|
|
City Tax
|
0.323185
|
|
School Tax
|
1.060006
|
|
Other Tax
|
0.136279
|
|
Phase One
|
Yes
|
|
Additional Comments
|
City owned utilities enables Scribner to have some of the most competitive utility rates and property tax rates available in the state.
|
|
|
|